Project information
Access capacity to the grid of a demand at Muniesa substation
February 2025 - May 2028
Funding entity Endesa
The aim of the collaboration is the study of the factors that may affect the access capacity of a demand in two substations of the transmission network.
Research topics:
- Steady-state: Load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks
EndesaDemandas